Back Analysis of Temperature Field and Temperature Stress of Jinghong RCC Dam
Dam temperature field and stress are influenced by many factors and of great complexity, also, there is a great deal uncertainty in dam construction. The back analysis with monitoring temperature data can match facts well and provides gist for professional decision. This paper takes Jinghong RCC dam as a research subject, using data analysis, back analysis and simulation analysis, and expatiating the problems that should be concerned in back analysis. Based on the result of back analysis, the present temperature control measures of Jinghong RCC Dam are rechecked, ideas and advices on temperature control measures in the next periods are issued.
RCC gravity dam temperature stress back analysis
Liu Yi Zhang Guoxin Liang Jianwen Yang Ping Dai Yihua Gong Yongsheng
China Institute of Water resources and Hydropower Research, Beijing 100038, China YLC Hydro Power Company, Jinghong, China
国际会议
第五届碾压混凝土坝国际研讨会(The Fifth International Symposium on Roller Compacted Concrete(RCC))
贵阳
英文
557-563
2007-11-02(万方平台首次上网日期,不代表论文的发表时间)