Research on Temperature Control Standard of Initial Impounding of Jinghong RCC Gravity Dam
Generally water temperature is lower than the dam temperature in reservoir impounding, which will lead to the abrupt temperature drop of the dam surface, and cleavage cracks will be easily formed in this process. Taken Jinghong RCC Gravity Dam as researching subject, temperature control standard which should be reached before dam impounding is studied in this thesis. According to practical construction Conditions, reasonable temperature control measures are determined to satisfy impounding requirements and for reference by the same kind of project.
Impounding thermal stress pipe cooling
Wu Zhipeng Zhang Guoxin
Dept. of Structures & Materials, IWHR, Beijing 100038