会议专题

Studies on the Construction Technology under High Temperature Condition and Its Application in Longtan Dam

Longtan Hydropower Station is the highest RCC dam under construction in the world, with characteristics of short construction duration, high construction strength which require continuous construction over year passing high-temperature seasons. Therefore, a series of studies on key technology for constructing dam with RCC have been proceeded and great achievements have been obtained, such as concrete mixing ratio, the control for concreting temperature and interval time between the concreting lifts. Detailed temperature control standard and construction requirements during rainy season have been put forward. Applying the continuous construction technologies in high-temperature seasons, RCC of 3. 18 million m3 has been completed in 2005.

rolled RCC temperature control concreting temperature water pipe for cooling construction technology

Dai Bo Cheng Gangwei

Longtan Hydropower Development Co., Ltd., Nanning 530023, China

国际会议

第五届碾压混凝土坝国际研讨会(The Fifth International Symposium on Roller Compacted Concrete(RCC))

贵阳

英文

687-690

2007-11-02(万方平台首次上网日期,不代表论文的发表时间)