THE CABLE FORCE DETERMINATION AND OPTIMIZATION OF THE LONG-SPAN CONCRETE CABLE-STAYED BRIDGES

In accordance with the construction supervision and control of several long-span cable-stayed bridges, the synthesis method and two-step reaching method are proposed to determine and optimize the cable force of the cable-stayed bridge in the completion state and construction state. The above methods are applied to the Bridge in Zhuzhou of Hunan province in China, which ensure the structure safety and lead to the expected rational completion state of the cable- stayed bridge.

Mei-Liang Yang Chuan-Xi Li Jian-Ren Zhang

Changsha University of Science and Technology, Changsha 410076, P.R. China