THE ALIGNMENT MONITORING AND SIMULATED STRUCTURALANALYSIS OF THE FOURTH XIANGJIANG BRIDGE IN XIANGTAN
The design and construction of the Fourth Xiangjiang Bridge in Xiangtan, which is the first cable-stayed flying-bird concrete-filled steel tubular arch bridge, are greatly different from other bridges, is greatly different from bridges. The alignment monitoring system is introduced in this paper, considering the feature of the construction of the bridge. Major concerns includes: (1) the erection of the survey control system and the selection of the measuring parameters; (2) analysis on alignment monitoring target under different construction stages; (3) Structural calculation about alignment control and parameter identification, that is simulation analysis with finite element method for the whole construction process.
Xin-Gu Zhong Xiao-Juan Shu Ming-Yan Shen
Prof., Civil Engineer School, Hunan University of Science and Technology, P.R. China Doc., Civil Engineer School, Hunan University of Science and Technology, P.R. China
国际会议
长沙
英文
733-738
2007-11-19(万方平台首次上网日期,不代表论文的发表时间)