A CASE STUDY ON THE SETTLEMENT DEFORMATION OF THE METRO TUNNEL STRUCTURE WHEN CROSSED BY A TUNNEL OR THERMAL SUPPLY

According to the monitoring data of metro line l crossed by a mining thermal tunnel in shallow depth, characteristic of the metro tunnels settlement deformation was summarized. It was found that: A small differential settlement deformation which was only about 0.15mm existed between the two sides of the expansion joint; Along with excavation, settlement deformation of the metro tunnel varied as sagging firstly, then heaving later and sagging a little again in the end; There was more than percent 50 of the final settlement deformation occurred in the phase before new constructed tunnels primary support been finished. Settlement deformation of the metro tunnel would be steady about days later after the crossing engineering completed.

Guang-Jie Lu Qing-Huai Liang

Urban Rail Transit Research Center, School of Civil Engineering & Architecture,Beijing iaotong Unive Urban Rail Transit Research Center, chool of Civil Engineering & Architecture, Beijing Jiaotong Univ

国际会议

第二届国际结构状态评估、监测与改进会议(The Second International Conference on Structural Condition Asessment,Monitoring and Improvement)

长沙

英文

1327-1332

2007-11-19(万方平台首次上网日期,不代表论文的发表时间)