会议专题

Integrated River Basin Management in Europe (Adricosm and Wamaribas Projects) and China (Wenyu River Project)

This paper illustrates the implementation of integrated river basin management in two European projects, WAMARIBAS in Italy and ADRICOSM in the Balkans, and one in China dealing with the restoration of the Wenyu River in Beijing. The common goal of the three projects is the abatement of pollutants in the receiving waters, badly deteriorated as result of anthropic actions. The projects employ state-of-the-art technologies for monitoring and modelling the hydraulics and water quality processes in the receiving waters and the sanitary infrastructure that discharges in the water bodies. The outcome is an evaluation of pollution sources and their impacts on the water bodies as well as the provision of an action plan with the optimal solutions to attain the required water quality standards. The experience gained by the writers in the implementation of the European projects has enabled the development of the ECO-Plan Kit, a toolkit consisting of the best practice and ecological technologies for the integrated analysis of the wastewater cycle. The current project in the Wenyu River intends to develop a replicable methodology that can be applied to similar realities all over China and in other countries with analogous needs.

integrated river pollution wastewater

Augusto Pretner Alessandro Bettin Luz Sainz Mao Bingyong Gan Hong Jiang Yunzhong

SGI Studio Galli Ingegneria SpA-Padova Italy DFS Engineering, Beijing China Institute of Water Resources and Hydropower Research-IWHR, Beijing, 100044, China

国际会议

第三届黄河国际论坛(The 3rd International Yellow River Forum on Sustainable Water Resources Management and Delta Ecosystem Maintenance)

山东东营

英文

366-375

2007-10-16(万方平台首次上网日期,不代表论文的发表时间)