会议专题

Exploration of Processing Leakage Method in Combined Parts of Flood Discharge Structures of Warping Dam--Case Study on the Key Dam of Jiuyuangou

Based on correlative information, there are 90% sickness and danger phenomena about warping dam which induced by flood discharge structures. And there are important significations by resolving combined problem between flood discharge structures and ground base, dam body backfill soil for that of loess plateau dam system engineering construction, safe operation and sustaining benefits. So we bring forward many settled countermeasures to deal with combined place of earth and stone, such as manual compacted backfill method, water drop method, and both combination and so on.

combined place leakage processing method warping dam

Li Yao Shang Guomei Ma Jian Wang Caiqin

Yellow River Soil and Water Conservation Suide Bureau, Suide, 718000, China

国际会议

第三届黄河国际论坛(The 3rd International Yellow River Forum on Sustainable Water Resources Management and Delta Ecosystem Maintenance)

山东东营

英文

261-263

2007-10-16(万方平台首次上网日期,不代表论文的发表时间)