Integrated Analysis of Seepage Stability on Old Gate at the Dike Foundation of Yellow River Downstream

The length of Yellow River downstream course is approximately 800km with the dike length of 1371km. The hidden trouble concealed under the dike-seepage stability of dike foundation old gate is geological problem of dike foundation and major issue of embankment management, plan, reinforcement, and reconnaissance design of Yellow River downstream. Therefore, it is necessary to implement widespread analysis and research on historical breach old gate and data of dike seepage deformation of previous big floods.

Yellow River downstream old gate hidden danger seepage distortion control measure

Lv Junqi Meng Bing Chen Peng Su Qiupeng

Yellow River Henan Bureau, YRCC