Integrated Analysis of Seepage Stability on Old Gate at the Dike Foundation of Yellow River Downstream
The length of Yellow River downstream course is approximately 800km with the dike length of 1371km. The hidden trouble concealed under the dike-seepage stability of dike foundation old gate is geological problem of dike foundation and major issue of embankment management, plan, reinforcement, and reconnaissance design of Yellow River downstream. Therefore, it is necessary to implement widespread analysis and research on historical breach old gate and data of dike seepage deformation of previous big floods.
Yellow River downstream old gate hidden danger seepage distortion control measure
Lv Junqi Meng Bing Chen Peng Su Qiupeng
Yellow River Henan Bureau, YRCC
国际会议
山东东营
英文
270-273
2007-10-16(万方平台首次上网日期,不代表论文的发表时间)