Simple Discussion on the Whole Process Quality Control of Flood Control Engineering Works Construction of the Yellow River

Since it is difficult to control the quality of flood control engineering works of the Yellow River due to the restriction of natural and social conditions, the whole process quality control during construction has become extremely important. Usually, the Employer entrusts the Engineer to conduct the whole process quality control, monitoring and supervision of construction, which include the control of technical preparation status, control of operational process of technical activities, control of technical activity results and the means of quality control of construction process.

flood control engineering works of the Yellow River construction whole process quality control

Liu Shuli Wang Weijun

Jiaozuo Yellow River Bureau, Jiaozuo, 454001, China Construction and Administration Department of Yellow River Conservancy Commission, Zhengzhou, 450003

国际会议

第三届黄河国际论坛(The 3rd International Yellow River Forum on Sustainable Water Resources Management and Delta Ecosystem Maintenance)

山东东营

英文

375-382

2007-10-16(万方平台首次上网日期,不代表论文的发表时间)