The Examination along with the Presentation of Flood-forecasting System in Real Time in the Maroon River Reservoir Dam through Using WMS Software (Watershed Modeling System)
The optimum exploitation of dams reservoir requires the short and long term time steps projecting. In general, the exploitation of dams reservoir depends on the amount of the river flow. The how muchness of the water importing into dams reservoirs may be different in regard to hydrologic & climatologic conditions. The main concern of this study is the presentation of the Maroon river flood-warning system in Real Time manner and in the Maroon dams reservoir cross section. In order to prepare a Flood-Warning system WMS software has been used. Totally we should pass two basic stages for presenting the Flood- Warning system. The stages are as follows: A. The calibration of the basin model, based on the recorded historical data such as: RIVER DISCHARGE, PRECIPITATION as well as TEMPERATURE. B. The flood routing in different cross sections of the river by making use of hydraulic & hydrologic methods.
the analysis of the river flow flood-warning system the optimum exploitation of dam reservoirs
Baghalnezhad Arash
The Great Karoon River Basin Reservoir Dams Planning Group, KWPA, Khuzestan-Ahwaz-P. O. 61335-137-The Assistance of Dam and Power Center Exploitation
国际会议
山东东营
英文
124-132
2007-10-16(万方平台首次上网日期,不代表论文的发表时间)