会议专题

Feasibility Analysis of Setting up Groundwater Monitoring System in Riverhead Area of the Yellow River

The general situation of riverhead district of the Yellow River is introduced. The necessity of setting up groundwater monitoring system of riverhead district is put forward by analyzing the current situation of groundwater monitoring and the characteristics of hydrological situation change in recent years. The feasibility of the groundwater monitoring system establishment of riverhead district is discussed with the analysis, assessment and investigation of the aspects such as technology, engineering, economy, social benefit etc.. Construction of this system is important in strengthening development and utilization of water resources, studying on the transformation rules of precipitation, groundwater and surface water of riverhead district, preventing natural calamity scientifically, strengthening the constructions of ecological environment, and promoting regional economy and society development.

Yellow River riverhead district groundwater monitoring system feasibility analysis

Du Deyan Wang Shengxiong Xu Yexin

Hydrology bureau of Yellow River Conservancy Commission, Zhengzhou, 450004, China Research Institute on Riverhead District of Yellow River, lanzhou, 730030, China

国际会议

第三届黄河国际论坛(The 3rd International Yellow River Forum on Sustainable Water Resources Management and Delta Ecosystem Maintenance)

山东东营

英文

275-280

2007-10-16(万方平台首次上网日期,不代表论文的发表时间)