Testing Research on UHV AC Substation Framework of China
UHV AC Experimental Pilot Project is the first one of UHV1000kV transmission and transformation in China .In order to ensure advanced technology and economy of the pilot project ,it is necessary to launch a testing research of UHV AC substation framework .This paper focuses on the testing program and the testing procedures of 1/2 scaled model testing of UHV AC substation framework, and the analysis of experimental data. The testing research conclusion of 1000kV AC substation framework can be used for the design instruction to substation framework of the pilot project .Through the test we accumulate experience of large structure like substation framework ,also establish the theoretical basis and practical foundation of the design and testing for the follow-up to 1000kV or higher voltage substation framework .
UHV substation framework tower testing station 1/2 scaled model test test case
Li Qinghua Geng Jingdu Chao Qiong Lin Xiaobing
Electric Power Construction Research Institute of SGCC,Beijing,100055,China East China Electric Design Institute, Shanghai, 200063, China
国际会议
广州
英文
2007-11-10(万方平台首次上网日期,不代表论文的发表时间)