Increasing stability of Long Distance Transmission in Sichuan, China

Three 500 km transmission lines with about 200 km length each connect the Ertan hydropower station to the Sichuan power grid. A fixed series capacitor is installed in each of these lines to compensate the line impedance. This improves stability in the Sichuan power transmission system. Hydro-power generation of the range here under discussion generally can be found in mountainous regions. Accordingly Puti substation is about 2200 m high. Together with the climatic conditions this requires special considerations during design of the HV systems.