Analysis of Guangzhou 10kv power grid neutral low resistance grounding

Through the analysis of single-phase grounding in NRS,the magnitude of the neutral low resisitance is presented, Give two examples of the configuration of 110kv&220kv transformer substation,illustrate those function of zero-sequence over current protection.Finally A simulation and some problems are presented .

NRS zero-sequence over current