会议专题

Optimum Allocation of Manufacturing Resources for Aviatic Project Based on AHP Approach

There are plenty of characteristics in aviatic project, such as manufacturing resources spreading, difference of resource requirement, and multiplicity of manufacturing resources. But in the planning of aviatic project, manufacturing resources must be allocated detailedly to every working procedure of part manufacturing and product assembling. For aviatic project, there are plenty of parts and sub-assemblies thousands upon thousands. It is very difficult to allocate manufacturing resources to every part and its manufacturing procedure. An approach of optimum allocation of manufacturing resources for aviatic project based on Analytic Hierarchy Process (AHP) approach is presented. Firstly, this paper applies Delphi Method to build the set of factors that effect results of manufacturing resources evaluating. Secondly, model optimizing resources allocation is built based on AHP method. The model includes three aspects of information: aims of resource allocating; evaluating factors and evaluated objects. And the algorithm of manufacturing resources allocation is presented. Finally, we apply the algorithm successfully to allocate machine tools manufacturing a rib of ARJ21 aircrafts wing.

Aviatic Project allocation of resource Analytic Hierarchy Process (AHP )

Han Suomin Yang Haicheng Yu Haishan

The Ministry of Education Key Lab of Contemporary Design and Integrated Manufacturing Technology, No The Ministry of Education Key Lab of Contemporary Design and Integrated Manufacturing Technology, No

国际会议

第七届国际测试技术研讨会

北京

英文

2007-08-05(万方平台首次上网日期,不代表论文的发表时间)