Study on Multiple Objective Optimization Method in Construction Project Management
Comprehensive tradeoff control on quality, construction duration, cost and resource equilibrium is main aspect of construction project management, and is significant for improving the benefits of construction projects. In this paper, firstly the time-cost relationship model, the quality-time relationship model and resource equilibrium-time model are set up separately, objectives of quality and resource equilibrium are introduced to traditional time-cost optimization model for comprehensive optimization. Furthermore, multiple objective model of schedule is established by synthesizing single-objective models of quality and resource equilibrium. Then, based on TOPSIS, comprehensive optimization scheme is selected according to relative approach degree. Finally a case study is presented to verify feasibility and practicability of method.
cost multiple objective quality resource equilibrium time limit TOPSIS
Zhao Rui Liu Xiaojun
School of Civil Engineering Xian University of Architecture & Technology Xian, P.R.China School of Management Engineering Xian University of Architecture & Technology Xian, P.R.China
国际会议
上海
英文
2007-09-21(万方平台首次上网日期,不代表论文的发表时间)