会议专题

Scheduling of Naphtha Feeding for Naphtha Cracking Center

This paper addresses the naphtha feeding problem for Naphtha Cracking Center (NCC). The naphtha feeding problem is composed of two main issues: the naphtha delivering from refineries to NCC and the naphtha blending in storage tanks in NCC. The first issue relates to the supplier selection and naphtha unloading scheduling. The latter involves the transfer of the naphtha from storage tanks to a mixing tank. The problem is formulated as a mixed linear integer programming. The objective function is to minimize a cost function that consists of naphtha prices, shipping expenses, and unloading costs.

Naphtha Cracking Center NCC Scheduling Planning

Taeyeong Lee Hong-Rok Sona Ho-Kyung Lee In-Bum Lee

Department of Chemical Engineering,Pohang University of Science and Technology,San 31 Hyoja-Dong Poh LG Chem,Ltd./Research Park,Moonji-dong,Yuseong-gu,Daejeon,Korea

国际会议

第四届亚洲过程系统工程会议暨2007年中国国际系统工程年会(The 4th International Symposium on Design,Operation & Control of Chemical Processes)(PSE ASIA 2007)

西安

英文

2007-08-15(万方平台首次上网日期,不代表论文的发表时间)