A Study of Heuristic Algorithm for AFS Machine Scheduling Problem
Because scheduling problem F2|m<,1>≥2,m<,2>=1|C <,max> proves to be NP-complete, no good algorithm is set already. In this paper, a heuristic algorithm is presented to find suboptimal solution and provided that the upper bounds of the performance ratio in the worst case for the heuristic algorithms are 2, which is illustrated to be achievable for the algorithm.
scheduling Assembly flow shop NP-complete heuristic algorithm performance ratio