会议专题

A Study of Heuristic Algorithm for AFS Machine Scheduling Problem

Because scheduling problem F2|m<,1>≥2,m<,2>=1|C <,max> proves to be NP-complete, no good algorithm is set already. In this paper, a heuristic algorithm is presented to find suboptimal solution and provided that the upper bounds of the performance ratio in the worst case for the heuristic algorithms are 2, which is illustrated to be achievable for the algorithm.

scheduling Assembly flow shop NP-complete heuristic algorithm performance ratio

Xuhua Lu Qingnong Su Rong Hu

College of Science, Wuhan University of Science and Technology, Wuhan, China

国际会议

2006现代科技国际研讨会(The International Workshop on Modern Science and Technology in 2006)

北京

英文

510-513

2006-04-01(万方平台首次上网日期,不代表论文的发表时间)