会议专题

Monitoring and Analysis on Huge Pile Axial Stress by BOTDR

A on-site experiment is carried out on a case project. The axial stress of pile which is more than 60meters long, and 1.0 meter thick, while the BOTDR technology is employed. The axial strains of pile are traced down during the process of static loading test, with nine steps of loading. After the axial strain is measured, the axial stress and force of pile are determined, and then the lateral friction force is also obtained. It reveals that there are several negative-friction segments on the lateral side of huge pile. The occurrence and development mechanism is analyzed in view of soil liquefaction and the variation of pore water pressure.

soil and foundation engineering BOTDR pile lateral friction force negative friction

Tonghe ZHOU Jianxue SONG

Zhengzhou University, Zhengzhou 450002, China

国际会议

The 2nd International Workshop on Opto-electronic Sensor-based Monitoring in Geo-engineering(第二届地质(岩土)工程光电传感监测国际研讨会)

南京

英文

87-90

2007-10-18(万方平台首次上网日期,不代表论文的发表时间)