会议专题

END-BEARING COMPOSITE PILE FOUNDATION AND ITS DESIGN METHOD

Because of the small settlement of the end-bearing pile, the capacity of soils among piles can not be carried out, even if the distance of piles is increased. Consequently all loads of the super-structure should be supported by piles only. The capacity of soils could not be used, and huge waste caused. This paper studied a kind of tailored equipment named deformation adjustor, which is used to adjust the deformation between the end-bearing pile and the soil among piles. The design method of the end-bearing composite pile foundation is presented, in which the end-bearing piles and the soil foundation are working together,especially the soil plays the main role. The design method has been shown to be successful.

End-Bearing Composite Pile foundation Deformation of Pile and Soil Deformation Adjustor

JINMIN ZAI FENG ZHOU GUOXIONG MEI XUDONG WANG

Department of Civil Engineering, Nanjing University of Technology, China

国际会议

第三届中日岩土工程研讨会(Proceedings of the 3rd Sino-Japan Geotechnical Symposium)

重庆

英文

739-748

2007-11-05(万方平台首次上网日期,不代表论文的发表时间)