会议专题

Evaluation Impact on the Combined Heat and Power System in New Heat Supply District of Kitakyushu

This paper discusses the introduction effect of the combined heat and power (CHP) system in new heat supply district of Kitakyushu. The energy consumption intensity of Kitakyushu can be inferred according to the energy consumption intensity of Tokyo. Utilize the floor area of different types of buildings and energy consumption intensity, calculate energy requirement in new heat supply district of Kitakyushu. Moreover, four cases (tracking heating, tracking electricity, etc.), which is using single air conditioner system, boiler system. Simultaneously, the energy consumption, intensity of CO2 emission, initial cost and running cost, pay back years are discussed.The results can be described as follows: The CHP system, the energy consumption, intensity of CO2 emission and running cost in the period of the respect is favorable.

Energy Supply System Energy Saving Environment-al Protection Economic Comprehensive Evaluation.

Xindong WEI Toru MATSUMOTO Yuan SU

Faculty of Environmental Engineering, Jilin Architectural and Civil Engineering Institute, Hongqi Ro Faculty of Environment Engineering, The University of Kitakyushu, 1-1, Hibikino, Wakamatsuku, 808-01 Faculty of Environmental Engineering, Jilin Architectural and Civil Engineering Institute, Hongqi Ro

国际会议

第五届暖通空调国际研讨会(Proceedings of the 5th International Symposium on Heating,Ventilating and Air Conditioning)

北京

英文

2007-09-07(万方平台首次上网日期,不代表论文的发表时间)