会议专题

THE OPTIMIZING AND CHOOSING OF AIR-CONDITIONING IN OFFICE BUILDING

Aiming to an energy-saving building in Tianjin, this article sets up an energy-consuming model in BIN Method. Choose three types of heating and cooling source, optimize systems suited to heating and cooling, and calculate their annual value of cost. The result indicates that the original-investment of ground source heat pump (simplified as GSHP) is more than others. But its running fee is the lowest. Furthermore, using renewable energy, GSHP is not only in favor of user, more important, it is beneficial to society.

Building energy-saving air-conditioning GSHP BIN cost

Zhou Zhihua Liu Xiaohai Yonggang Li

School of Environment Science and Technology, Tianjin University, Tianjin 300072, China China Construction Design International Ltd.Beijing 100029, China Tianjin Architecture Design Institute, Tianjin 300074

国际会议

第五届暖通空调国际研讨会(Proceedings of the 5th International Symposium on Heating,Ventilating and Air Conditioning)

北京

英文

2007-09-07(万方平台首次上网日期,不代表论文的发表时间)