会议专题

New Research About The Continuously Measure Wheel/Rail Contact Point On-rail

On-rail detecting of contacting points between wheel/rail is very important to monitor the safety status of the running vehicle. But it is very difficult because of the rotation of the wheel. On the basis of conventional instrumented wheelsets, an additional bridge to induce the changes of contact point is added. In order to decrease the influence of the rotation of the wheel, 6 bridges needed. Equations between output of the bridges and contact point are non-linear. A method based on Principal Component Analysis(PCA) is used in the paper to map 6-dimense vector to 2-dimense one, and simplify the complex equations to linear equations. Contact points can be obtained by the solution of the linear equations. Experiment shows high accuracy of this method.

wheel/rail contact point Fourier series Principal Component Analysis instrumented wheelset

Ren yu Chen jianzheng

National Traction Power Lab.,Southwest Jiaotong University,Chengdu 610031,China

国际会议

第八届国际电子测量与仪器学术会议(Proceedings of 2007 8th International Conference on Electronic Measurement & Instruments)

西安

英文

2007-08-16(万方平台首次上网日期,不代表论文的发表时间)