会议专题

Spatiotemporal Scheduling Method for Block Construction in Shipbuilding

The scheduling problem of block construction in shipbuilding is spatiotemporal coupling scheduling problem, and it is vital to improve shipbuilding productivity. In this paper, the outline of Improved Rolling Horizon Procedures (IRHPs) based on decomposition technique is proposed, and IRHPs consists of pre-scheduling algorithm, spatiotemporal planning algorithm and the rolling principle, we use dual genetic algorithms for pre-scheduling and spatiotemporal planning. IRHP is virtually the time-based decomposition method, so through which the scale of the scheduling problem can be reduced and fewer blocks are to be considered at every time window corresponding to every working plate. In this study, we focus on the spatiotemporal scheduling algorithm, which orients on blocks planned to be scheduled in one working plate. Finally, simulation is given to prove the effectiveness of this algorithm.

Genetic Algorithm IRHPs (Improved Rolling Horizon Procedures) Pre-Cheduling Algorithm Rolling Principle Spatiotemporal Algorithm

Wang Lei Zhang Zhiying Jiang Zhibin

Dept.of Industrial Engineering and Management, Shanghai Jiaotong University, Shanghai P.R.China, 200240

国际会议

第十四届工业工程与工程管理国际会议(The Proceedings of The 14th International Conference on Industrial Engineering and Engineering Management IE&EM2007)

天津

英文

2007-10-20(万方平台首次上网日期,不代表论文的发表时间)