会议专题

Evaluating the Execution of Gemba Management Based on the Fuzzy Comprehensive Evaluation Method and the Generalized BCG Matrix Model

This paper points out the importance of the execution of gemba management, designs the index system for the evaluation of execution of gemba management. Based on the Fuzzy Comprehensive Evaluation Method and the Generalized BCG Matrix Model, an individual enterprise s execution of gemba management level and its trend is analyzed to find out the reason behind the gemba management level s difference

Gemba Management Execution Fuzzy Comprehensive Evaluation Method Generalized BCG Matrix Model

Feng Zhenhuan Zheng Chundong

School of Business, Tianjin University of Finance and Economics, Tianjin P.R.China, 300222 School of Management, Tianjin University, Tianjin P.R.China, 300072

国际会议

第十四届工业工程与工程管理国际会议(The Proceedings of The 14th International Conference on Industrial Engineering and Engineering Management IE&EM2007)

天津

英文

2007-10-20(万方平台首次上网日期,不代表论文的发表时间)