Study on the Production Scheduling in Agile Virtual Enterprise Based on Multi-agent Technology
Agile virtual enterprise ( AVE), as one of the most important and novel organization paradigm in global manufacturing, is increasingly being focused. The production scheduling is a big problem for AVE because of the highly dispersed manufacturing resources. After analysis of the operation characteristics of AVE in this paper, we propose a production scheduling model of AVE and corresponding algorithm based on multi-agent technology. At last a case study is conducted to illustrate the validity of this model and its corresponding algorithm.
Production Scheduling Multi-Agent System (MAS) Agile Virtual Enterprise
Ding-zhong Feng Ye-fei Chen Mei-xian Jiang
College of Mechatronics Engineering, Zhejiang University of Technology, Hangzhou P.R.China, 310032
国际会议
天津
英文
2007-10-20(万方平台首次上网日期,不代表论文的发表时间)