会议专题

A risk-based life cycle design approach for tunnel lining

The purpose of this paper is to develop a framework transforming the traditional tunnel lining design approach into a risk-based life cycle design approach. Firstly, shortages existing in traditional design method are illustrated. Then risk theory and life cycle cost analysis are adopted to deal with these problems such as the high degree of uncertainty and complexity in tunnel lining design. In response to the features of tunnel lining design, the application of life cycle cost analysis, risk assessment and decision-making in tunnel lining design are discussed. And a general design flowchart is presented, which can provide decision makers an informed way to make their choices through evaluating the design options by life cycle cost and risk assessment during its lifetime and obtain an optimum design alternative balanced with safety, durability and cost.

Y.Wang H.W.Huang

Tongji University, Shanghai, China

国际会议

第一届岩土工程安全与风险国际研讨会(Proceedings of the First International Symposium on Geotechnical Safety & Risk ISGSR2007)

上海

英文

2007-10-18(万方平台首次上网日期,不代表论文的发表时间)