Research on Multi-Agent Based Flexibility Resource Constraints Project Scheduling Problem
In light of the dynamic complexity of resource constraints project scheduling problem, this paper proposes a project scheduling model based on multi-agent, such as planning agent, task agent, resource agent and resource management agent. The project scheduling is accomplished through the mechanism with a designed algorithm of dynamic scheduling, which may well realize dynamic scheduling and ensure evolution of the scheduling system in the direction of global optimization.
Multi-Agent Flexible resources Scheduling
Luo Ronggui He Tao Tan Lu
School of Management, Wuhan University of Technology, P.R.China, 430070
国际会议
第六届管理学国际会议(Proceedings of ICM2007 the 6th International on Management)
武汉
英文
1994-1999
2007-08-03(万方平台首次上网日期,不代表论文的发表时间)