会议专题

Research on Multi-Agent Based Flexibility Resource Constraints Project Scheduling Problem

In light of the dynamic complexity of resource constraints project scheduling problem, this paper proposes a project scheduling model based on multi-agent, such as planning agent, task agent, resource agent and resource management agent. The project scheduling is accomplished through the mechanism with a designed algorithm of dynamic scheduling, which may well realize dynamic scheduling and ensure evolution of the scheduling system in the direction of global optimization.

Multi-Agent Flexible resources Scheduling

Luo Ronggui He Tao Tan Lu

School of Management, Wuhan University of Technology, P.R.China, 430070

国际会议

第六届管理学国际会议(Proceedings of ICM2007 the 6th International on Management)

武汉

英文

1994-1999

2007-08-03(万方平台首次上网日期,不代表论文的发表时间)