A FUZZY SCHEDULING METHOD IN EQUIPMENT GRID
Equipment grid and equipment pool model of equipment grid are introduced.The process from submitting a job in equipment grid to obtaining of results is analyzed.A fuzzy scheduling method is proposed in equipment pool when a job is submitted to one of equipments within a pool.Fuzziness of this method lies in vagueness of users appraisals about experiment results and execution quality of equipments.Equipment in a pool has a probability, which can be adjusted by users fuzzy appraisals, to be scheduled.Users feedback information is used in this paper to improve execution quality.Some algorithms are provided to increase utilization ratio of equipments with high execution quality and decrease utilization ratio of those with poor execution quality.From simulation result, it is obvious that this method and related algorithms can provide users more chances with high execution quality.
Equipment grid Fuzzy Scheduling Execution quality
JIE YIN YUE-XUAN WANG CHENG WU
National CIMS Engineering Research Center, Department of Automation, Tsinghua University, Beijing, 1 Institute for Theoretical Computer Science, Tsinghua University, Beijing, 100084, China
国际会议
2007 International Conference on Machine Learning and Cybernetics(IEEE第六届机器学习与控制论国际会议)
香港
英文
3099-3103
2007-08-19(万方平台首次上网日期,不代表论文的发表时间)