A SCHEDULING MODEL OF UNRELIABLE MANUFACTURING SYSTEMS ON RECEDING HORIZON
An unreliable manufacturing system is examined.The system can produce several types of products.A setup (with setup time or cost or both) is considered when the production is switched from one type of products to another.The decision variables are a sequence of setups and the production plan.After a more straightforward necessary condition and a necessary and sufficient condition for the optimality of the just-in-time (JIT) control policy were presented respectively, based on the hedging point control policy and the idea of JIT (just-in-time), a new real-time receding horizon scheduling algorithm is presented.Numerical results are also presented.
Hybrid system Setup cost Hedging point policy
JUN LIU ZHI-YUAN RUI JUN-TIAN ZHAO E-MIN LI
School of Mechanical & Electronical Engineering, Lanzhou University of Technology, Lanzhou, 730050 P.R.China
国际会议
2007 International Conference on Machine Learning and Cybernetics(IEEE第六届机器学习与控制论国际会议)
香港
英文
3104-3109
2007-08-19(万方平台首次上网日期,不代表论文的发表时间)