A GA-BASED APPROACH FOR SOLVING FUZZY PROJECT SCHEDULING

In this paper, a new optimization method based on GA for solving resource-constraint project scheduling with uncertain activity duration is proposed.Fuzzy set theory is used to represent the uncertainties of activity duration.A searching technique using genetic algorithm is adopted to search for the minimum of fuzzy project makespan.A case with uncertain activity duration is used to illustrate the performance of the proposed method.

Project scheduling Genetic algorithm Fuzzy set theory

YAN LIU SHENG-LI ZHAO XI-PING ZHANG GUANG-QIAN DU

School of Mechanics and Civil Engineering, China University of Mining and Technology, Beijing, 10008 Rural and Urban Construction College, Hebei Agricultural University, Baoding, 07100, China