会议专题

The Colliery Flood Response System Based on MAS

Along with the increased depth of coal mine, the crisis of flood is more and more severe. Aim at this question, the concept of colliery flood response is proposed, and furthermore, the colliery flood response system which focuses on the flood prevention and control is established. This system regards the colliery water bursting prevention and emergency response as the drainage requirement, and on the base of MAS (Multi-Agent System), designs the negotiation mechanism of colliery flood response through Agent organization coalmine and its drainage resources of succor department. Not only the colliery drainage requirement of constant effect can be response in time, but also the succor solution can be consisted quickly after the colliery flood. So, the disadvantage of the former colliery flood cure process including slow response speed, blindness and inefficient succor resources distribution will be overcome.The response system provides the integrated information platform for colliery flood prevention, emergency succor and post-flood affairs treatment so that the response ability of colliery flood is advanced and the flood damage of people and properties is minimized.

Colliery flood response system MAS negotiation

Lijie Feng Jinfeng Wang Yadong Li

Henan Rescuing Center for Mineral Disaster Zhengzhou University Tianjin University

国际会议

The First International Workshop on Information Systems for Crisis Response and Management(ISCRAM CHINA 2006)(第一届国际危机响应与管理信息系统中国研讨会)

哈尔滨

英文

49-54

2006-09-02(万方平台首次上网日期,不代表论文的发表时间)