Design Task Planning and Dynamic Scheduling to Concurrent Engineering

In order to take full advantages of the resources and reduce design time, it was studied design task decomposition and task dynamic scheduling according to the characteristic of product design process on CE (Concurrent Engineering).This paper discusses the principle of task decomposition during product design process and the tree construction of task decomposition. The method of modeling for design task scheduling is investigated. The paper proposes dynamic scheduling algorithm that arranges the tasks and distributes resource according to the priority.

task decomposition dynamic scheduling CE