Introduction of an Integrated Bridge Information Management System
The main functions and property of the IBMS are introduced. A five-grade on site evaluation method and a bridge condition assessment method have been developed. The arithmetic of bridge condition forecast is introduced. The maintenance plan optimization is developed basing on enumerating. The advantages and disadvantages of enumerating function in maintenance plan optimization are summarized.
Bridge management system Condition assessment Condition forecast Maintenance plan optimization
SHI, Xue-Fei FENG,Wen-Jun Ruan,Xin Hu,Bin
Tongji Univeristy Shanghai, China Tongfeng Engineering Consult Co.Ltd. Shanghai, China
国际会议
上海
英文
444-453
2007-05-16(万方平台首次上网日期,不代表论文的发表时间)