Design, Operation and Assessment of Pre-split Blasting in Open Cut Coal Mine
Pie-split blasting technique is required in open cut mines to protect the integrality and stability of die final wall. Anjialing Open Cut Coal Mine had long worked on the application of this technique, but the performance was not obviously good. Therefore, re-design, optimization, trial and assessment of pre-split blasting were carried out, which unproved the blasting performance and quality. Parameters in the design calculated by empirical formula and modified from actual practices meet the requirement of pre-split blasting of sedimentary rock stratus and brings good blasting performace. For pre-split blasting design, parameters should be modified with actual rock properties. This paper is to summarize and share the successful experience with similar mines.
pre-split blastingiopen cut mines assessment
CHANG Yonggang HE Changbin QIAO Dianhong SUN Kuan
Shanxi Pingshuo Anjialing Open Cut Coal Co., Ltd, Shuozhou, Shanxi, China
国际会议
The Asian-Pacific Symposium on Blasting Techniques(亚洲太平洋地区爆破技术研讨会)
昆明
英文
172-174
2007-05-08(万方平台首次上网日期,不代表论文的发表时间)