Research and Application of Crushing Pit Exavation by Controlled Long Hole Blasting

In the construction of Phase Three ore crushing system at Dagushan Iron Mine, vertical long-hole blasting technology was used in excavating rock pit base used for crushing ore. By this way the excavation period was shortened. In the design and construction, the technique of short-delay presplitting blasting between-holes and in-hole was successfully applied and good technical and economical results have been achieved that provided a certain valuable references to similar domestic engineering blasting.

Base pit Vertical long hole In-hole short delay Presplitting blasting

XU Liansheng WANG Zhizhong

The Dagushan Iron Ore Mine of Anshan Iron & Steel Co. Ltd., Anshan, China

国际会议

The Asian-Pacific Symposium on Blasting Techniques(亚洲太平洋地区爆破技术研讨会)

昆明

英文

197-199

2007-05-08(万方平台首次上网日期,不代表论文的发表时间)