会议专题

Demolition of a Eleven-storey Building and Five Fifteen-meter High Concrete Pots by Blasting

The method of using definite directional blasting to demolish the frame structure building is introduced, and method election, parameters calculating, the election of detonating delay are presented in this paper. The results have some reference significance for the similar engineerings.Hue print: (1) The building and concrete pots are ignited by the same time; (2) In order to ensure the support intensity, the load-bearing columns, which located in reverse of the main building, only are destroyed in the small scope, the bearing wall do not be destroyed;(3) The concrete crossbeam between the main building with the vice-building must be cut off entirely by the pre-processing; (4) The tapholes of concrete pots are disposed properly before the ignition.

controlled blasting blasting parameter ignition delay directional collapse

LIU Liansheng WANG Xuguang YU Yalun JIAO Yongbin LU Zhexiang

University of Science and Technology Beijing , Beijing, China;Beijing General Research Institute of Beijing General Research Institute of Mining and Metallurgy, Beijing, China University of Science and Technology Beijing , Beijing, China Jiangxi University of Science and Technology, Jiangxi Ganzhou, China

国际会议

The Asian-Pacific Symposium on Blasting Techniques(亚洲太平洋地区爆破技术研讨会)

昆明

英文

311-313

2007-05-08(万方平台首次上网日期,不代表论文的发表时间)