会议专题

Safety Priming Reliability Analysis of Digging Blasting Coal Mine

The missed and partial blasting in blasting project not only effect blasting result but also increase safety incipient fault in the wall of coal mines. By aggregate analysis various reasons for blasting equipment, blasting network and blasting technology and so on. So put forward technical measures to preventing the missed and partial blasting. And deal with the correct way of the missed and partial blasting by < safety regulations in coal mine> and < safety regulations in blasting>.

coal mine blasting miss-fire partial blasting blasting material blasting network

ZONG Qi ZHOU Shengbing ZHANG Li

Anhui University of Science and Technology, Huainan Anhui, China

国际会议

The Asian-Pacific Symposium on Blasting Techniques(亚洲太平洋地区爆破技术研讨会)

昆明

英文

390-392

2007-05-08(万方平台首次上网日期,不代表论文的发表时间)