会议专题

Feasibility Research on Exploitation Protective Pillars under Railway in Linsheng Coal Mine

In order to mine protective pillars under railway (shenyan-dalian) in Linsheng coal mine and solve problem for urgent lack of coal resources, feasibility for exploitation protective virgin coal under railway in Linsheng coal mine and influence on railway were analyzed in this paper. Three projects including full caving method, strip pillar mining method and backfilling method were brought forward, movement and deformation of the surface after mining was predicted based on Probability Integral Method. It presented maximum subsidence, horizontal deformation, horizontal movement, inclined deformation and curvature deformation for each project above. Combining with practical instance of Linsheng coal mine technique and economy comparison these projects were carried through. It is confirmed that backfilling method is the best of project at last, maintenance measures for running of railway after mining were put forward.

feasibility protective pillars Probability Integral Method backfilling method movement and deformation

WANG Meng TI Zhengyi SU Zhongjie Wang Dong

College of Resources and Environment Engineering, Liaoning Technical University, Fuxin 123000, Liaon College of Resources and Environment Engineering, Liaoning Technical University, Fuxin 123000, Liaon Institute of Civil Engineering, Liaoning Technical University, Fuxin 123000, Liaoning, China

国际会议

The 2007 International Symposium on Safety Science and Technology(2007采矿科学与安全技术国际学术会议)

河南焦作

英文

258-263

2007-04-17(万方平台首次上网日期,不代表论文的发表时间)