The Study Of Relative Technical Issues About The Design Of Extending The Maximum Dredging Depth Of Jinhangjun221 (222)

In May 2004,in response to the request of Tienjin Waterway Bureau about extending the maximum dredging depth of JINHANGJUN221 (222)dredgers,we started reformation project argumentations and technical designs for the ships successively.The reformation of JINHANGJUN221 has already been completed in Tianjin Ship co,ltd of CHEC in April 2005,and the ship works well since it was reformed.

Extending dredging depth Strength checking Technical project

LIU FENGLIN QIN XIUHUA WANG LIQIANG HAN SHIWEI YANG JIANHUA

Tianjin Waterway Prospecting & Design Research Institute