An Brief Introduction to Huanghua Port Dredging Project
The article focuses on the technical difficulties of Huanghua port channel dredging------the silty coast dredged difficultly and the frequent sudden aggradation resulting from gale. Through the analysis of the soil evolution and the cause of sudden aggradation, the article expatiates that the construction unite take effective measures to obtain higher efficiency. At the same time, it introduces the construction of the rectification project and a vista of the future.
the huanghua port sudden aggradation resulting from gale the silty coast,the breakwater
Tian Junfeng Wu Yun
CHEC Technical Department CHEC Dredging Co.,Ltd.
国际会议
广州
英文
2006-05-23(万方平台首次上网日期,不代表论文的发表时间)