Construction Technology of Silt Removal From Foundation Trench Of Immersed Tube Tunnel
The paper combining with the construction process of silt removal from foundation trench of immersed tube tunnel at E. Waihuan Road in Ningbo, discourses upon the technology of silt removal from base channel and concludes distinguishing features of the technology and some noticeable and remarkable points during the construction. The paper is valuable reference of better solving problems of similar project.
dredge foundation trench silt removal typical project
Dong Jiangping
No.2 Engineering Corp. Shanghai Dredging Corp. CHEC E. Yanjiang Road 221, Zhenghai, Ningbo
国际会议
广州
英文
2006-05-23(万方平台首次上网日期,不代表论文的发表时间)