Construction Technology of Silt Removal From Foundation Trench Of Immersed Tube Tunnel

The paper combining with the construction process of silt removal from foundation trench of immersed tube tunnel at E. Waihuan Road in Ningbo, discourses upon the technology of silt removal from base channel and concludes distinguishing features of the technology and some noticeable and remarkable points during the construction. The paper is valuable reference of better solving problems of similar project.

dredge foundation trench silt removal typical project