会议专题

Research on the Armored Materiel Maintenance Time and Its Distribution

This paper assumes that the armored materiel maintenance time consists of maintenance preparation time, maintenance task time and maintenance packing-up time. By analyzing the factors which influence the maintenance time, a special corrective coefficient is defined and the general methods to calculate the battle damaged armored materiel maintenance time are brought forward. The method of generating battle damaged armored materiel components in the simulation process is explored and a simulation model is established to produce battle damaged armored materiel maintenance time by means of neural network arithmetic and the simulation data of damaged tank maintenance time are produced. According to the statistical analysis of the simulation data, the conclusion that battle damaged armored materiel maintenance time accords with эрланга distribution is given, which is valuable for the practice of materiel maintenance support.

battle damaged armored materiel maintenance time simulation distribution

CHEN Chunliang ZHANG Huiqi LV Huiqiang

Technical Support Engineering Department, Academy of Armored Force Engineering, China

国际会议

The First International Conference on Maintenance Engineering(首届维修工程国际学术会议)

成都

英文

968-972

2006-10-15(万方平台首次上网日期,不代表论文的发表时间)