Research on Maintenance Task Forecast of Maintenance Unit in Wartime
Based on the analysis of the setup and task division of maintenance unit in wartime, the calculation formula of equipment total damage quantity was established in this paper. Through analyzing the characteristics of maintenance object the model of calculation probability of maintenance object filled into every grade maintenance unit was gained. The model for calculating equipment damage quantity filling into every grade maintenance unit was summed up. The forecast model of maintenance unit task was established. An example of this model was given to verify the proposed method.
repair task repair object forecast model
LV Huiqiang DONG Yuansheng CHEN Chuniiang YU Haitao
Department of Technical Support Engineering, Academy of Armored Forces Engineering, China
国际会议
The First International Conference on Maintenance Engineering(首届维修工程国际学术会议)
成都
英文
1047-1050
2006-10-15(万方平台首次上网日期,不代表论文的发表时间)