The Yangtze Estuary Deepwater Channel Maintenance Dredging Project

The Yangtze Estuary deepwater channel regulation project is a maritime engineering works of the largest scale ever since the foundation of New China in 1949. It comprises the buildings of guide dikes, groins to divert flow and widening, deepening and extension of channel by dredging. The dredging works for the stage 1 channel was commenced in July, 1999, the channel from the upper entrance of the North Passage till outside estuary was dredged into a double-way channel, 300m. width in bottom and 51.77km. long. The dredging works of 31.82 m.3 has been completed by using more man ten of trailed suction hopper dredge with which are in hopper capacity from 6500,4500 to 2000m3. By the end of March, 2000, the depth has been reached up to the required -8.5m navigable depth. This paper gives a presentation of the process, problems and measures taken and some lessons and experience drawn from the execution of the works. About the authors:

the Deepwater Channel in the Yangtze Estuary Maintenance Dredging

Liu Yinong Wang Minqiu Xie Xiaoyun

Senior engineer Shanghai Waterway Bureau 6/F,13 Zhong Shan Dong Yi Rd., 200002 Engineer, CHEC Dredging Co., Ltd 140 Dong Tang Rd., Pudong, Shanghai, 201208

国际会议

The First China International Dredging Congress and Exhibition(中国第一届国际疏浚技术发展会议)

上海

英文

16-22

2003-11-26(万方平台首次上网日期,不代表论文的发表时间)