会议专题

The Construction and Maintenance of The Deep-Waterway in Yangtze Estuary

The first stage regulated project of deep-waterway in Yangtze Estuary is through building regulation structures to stabilize the inflow current and me flow field, and make the ebb tides main current accord with the channels axis in North Passage. Based on such result, we have succeeded in the construction and maintenance of the 8.5m deep waterway. Thanks to the exact management, we have got every units construction details, and after analysis, we have also got some imponant rules of channels back silting. And in the waterways maintenance management and the navigable depths enactment, we also proceed persistently.

Yangtze Estuary deep-waterway water and sand environment cnannels back silting channels maintenance channels management

Jin Liu Tan Zewei Li Wenzheng

Yangtze Estuary Waterway Construction CO.,LTD

国际会议

The First China International Dredging Congress and Exhibition(中国第一届国际疏浚技术发展会议)

上海

英文

72-83

2003-11-26(万方平台首次上网日期,不代表论文的发表时间)