Conversion Design for 12,000m3 Large Size Hopper Dredger
Devcloping a large size new hopper dredger need to invest several hundred million RMB and need long construction period. A creative idea is formed and proposed by Shanghai Waterway Bureau (SHWB) that is conversion of cargo ship into hopper dredger instead of new construction. The objective of conversion with less cost and short period is successfully achieved in the end to satisfy with dredging market urgent demand in time. This paper intend to introduce the conversion design of the hopper dredger named New Sea Elephant
Cargo Ship Large Size Hopper Dredger Conversion Design
Zhoujian Feilong Wang Zhongxian Feng Weizhong
Marine Design & Research Institute of China
国际会议
The First China International Dredging Congress and Exhibition(中国第一届国际疏浚技术发展会议)
上海
英文
526-537
2003-11-26(万方平台首次上网日期,不代表论文的发表时间)