Pennys Bay Reclamation for the Hong Kong International Theme Park Development
The Civil Engineering Department of the Government of the HKSAR has been carrying out a large scale reclamation at the Pennys Bay. Lantau Island since 2000 to provide 280 ha of land for the development of the Hong Kong Disneyland. The reclamauon is undertaken in two stages. The Stage 1 Reclamation commenced in May 2000 and was completed in December 2002. The Stage 2 Reclamation started in March 2003 for completion in the year 2008. This paper provides a background and an overview of this important project. The dredging, reclamation, soil improvement methods as well as environmental monitoring and mitigation measures are also described.
Trailer suction hopper dredger reclamation methods soil improvement vibrocompaction surcharge environmental monitoring and mitigation measures
Y S Chow S C Yip M Y Tang
Deputy Director, Civil Engineering Department, Government of the HKSAR Assistant Director, Civil Engineering Department, Government of the HKSAR Senior Engineer, Civil Engineering Department, Government of the HKSAR
国际会议
The First China International Dredging Congress and Exhibition(中国第一届国际疏浚技术发展会议)
上海
英文
96-103
2003-11-26(万方平台首次上网日期,不代表论文的发表时间)