会议专题

Specifying the River Bed Configuration by Modern Surveying Techniques

The riverbed surveying is needed in new hydraulic engineering project (e.g. hydropower plant) or in the maintenance dredging. The data of the bed topography can be used the raw data for the numerical flow models. The numerical flow models can simulate me hydraulic losses in the river and the dredging needs can be specified. In the maintenance, the real-time display shows immediately the areas for the need for the dredging. The data can be processed, the masses can be calculated and the costs are estimated. The river/channel profile can be measured alter the dredging and the design depths can be verified.

surveying bedforms aquaticsonar.

Juha Laasonen Ilkka Kylm(a)nen Wang Qi Xiong

Fortum Service Oy, Hydropower Services. P.O.Box 10,00048 Fortum (Vantaa). FINLAND Kemijoki Oy, Valtakatu 9-11, P.O.Box 8131,96101 Rovamemi. FINLAND Kaukomarkkinat Oy, Kutojantie 4, P.O.Box 40,02631 Espoo, FINLAND

国际会议

The First China International Dredging Congress and Exhibition(中国第一届国际疏浚技术发展会议)

上海

英文

164-171

2003-11-26(万方平台首次上网日期,不代表论文的发表时间)